Construction scheduling and project controls

Know if your schedule can be trusted before the owner asks

Taha Messaoudi builds, reviews and recovers Primavera P6 schedules for construction projects, and trains the teams who run them.

The check is free, with no sign-up. Your file is read and never saved.

Activity IDActivity NameZ1B2Block 2 - Data Hall SouthSLStructureSL1Zone 1 - Block 2 - Bay 1Z1B2-SH1-0000Zone 1 - Block 2 - Erect Slab Shoring 1Z1B2-PR1-0000Zone 1 - Block 2 - Set Precast Beams 1Z1B2-SS1-0000Zone 1 - Block 2 - Tie Slab Steel 1Z1B2-CS1-0000Zone 1 - Block 2 - Cast Floor Slab 1Z1B2-PT1-0000Zone 1 - Block 2 - Post-Tension Slab 1Z1B2-RS1-0000Zone 1 - Block 2 - Fix Roof Steel 1Z1B2-SE1-0000Zone 1 - Block 2 - Seal Floor Slab 1Z1B2-BY1-0000Zone 1 - Block 2 - Bay 1 CompleteSL2Zone 1 - Block 2 - Bay 2Z1B2-SH2-0000Zone 1 - Block 2 - Erect Slab Shoring 2Z1B2-PR2-0000Zone 1 - Block 2 - Set Precast Beams 2Z1B2-SS2-0000Zone 1 - Block 2 - Tie Slab Steel 2Z1B2-CS2-0000Zone 1 - Block 2 - Cast Floor Slab 2Z1B2-PT2-0000Zone 1 - Block 2 - Post-Tension Slab 2Z1B2-RS2-0000Zone 1 - Block 2 - Fix Roof Steel 2Z1B2-SE2-0000Zone 1 - Block 2 - Seal Floor Slab 2Z1B2-BY2-0000Zone 1 - Block 2 - Bay 2 CompleteZ1B2-SH1-0000 Zone 1 - Block 2 - Erect Slab Shoring 1 Predecessors: Z1B2-GD3-0000 FS Successors: Z1B2-PR1-0000 FSZ1B2-PR1-0000 Zone 1 - Block 2 - Set Precast Beams 1 Predecessors: Z1B2-SH1-0000 FS Successors: Z1B2-SS1-0000 FSZ1B2-SS1-0000 Zone 1 - Block 2 - Tie Slab Steel 1 Predecessors: Z1B2-PR1-0000 FS, Z1B1-SS5-0000 FS Successors: Z1B2-CS1-0000 FS (driving), Z1B2-SS2-0000 FS (driving)Z1B2-CS1-0000 Zone 1 - Block 2 - Cast Floor Slab 1 Predecessors: Z1B2-SS1-0000 FS (driving) Successors: Z1B2-PT1-0000 FS, Z1B2-PT1-0000 FS+7d (driving)Z1B2-PT1-0000 Zone 1 - Block 2 - Post-Tension Slab 1 Predecessors: Z1B2-CS1-0000 FS, Z1B2-CS1-0000 FS+7d (driving) Successors: Z1B2-RS1-0000 FS (driving)Z1B2-RS1-0000 Zone 1 - Block 2 - Fix Roof Steel 1 Predecessors: Z1B2-PT1-0000 FS (driving) Successors: Z1B2-SE1-0000 FS (driving)Z1B2-SE1-0000 Zone 1 - Block 2 - Seal Floor Slab 1 Predecessors: Z1B2-RS1-0000 FS (driving) Successors: Z1B2-BY1-0000 FS (driving)Z1B2-BY1-0000 Zone 1 - Block 2 - Bay 1 Complete Predecessors: Z1B2-SE1-0000 FS (driving) Successors: Z1B2-SB1-0000 FS (driving), Z0B0-MS2-0000 FSZ1B2-SH2-0000 Zone 1 - Block 2 - Erect Slab Shoring 2 Predecessors: Z2B3-GD1-0000 FS Successors: Z1B2-PR2-0000 FSZ1B2-PR2-0000 Zone 1 - Block 2 - Set Precast Beams 2 Predecessors: Z1B2-SH2-0000 FS Successors: Z1B2-SS2-0000 FSZ1B2-SS2-0000 Zone 1 - Block 2 - Tie Slab Steel 2 Predecessors: Z1B2-PR2-0000 FS, Z1B2-SS1-0000 FS (driving) Successors: Z1B2-CS2-0000 FS (driving), Z1B2-SS3-0000 FS (driving)Z1B2-CS2-0000 Zone 1 - Block 2 - Cast Floor Slab 2 Predecessors: Z1B2-SS2-0000 FS (driving) Successors: Z1B2-PT2-0000 FS, Z1B2-PT2-0000 FS+7d (driving)Z1B2-PT2-0000 Zone 1 - Block 2 - Post-Tension Slab 2 Predecessors: Z1B2-CS2-0000 FS, Z1B2-CS2-0000 FS+7d (driving) Successors: Z1B2-RS2-0000 FS (driving)Z1B2-RS2-0000 Zone 1 - Block 2 - Fix Roof Steel 2 Predecessors: Z1B2-PT2-0000 FS (driving) Successors: Z1B2-SE2-0000 FS (driving)Z1B2-SE2-0000 Zone 1 - Block 2 - Seal Floor Slab 2 Predecessors: Z1B2-RS2-0000 FS (driving) Successors: Z1B2-BY2-0000 FS (driving)Z1B2-BY2-0000 Zone 1 - Block 2 - Bay 2 Complete Predecessors: Z1B2-SE2-0000 FS (driving) Successors: Z0B0-MS2-0000 FS
CriticalOtherComplete
$3B+
Rail transit
Lead Scheduler on a major project
$1B+
Urban rail programme
Led a team of 8 schedulers
$1B+
Power plants
Lead planner across 5 hydroelectric projects

Also infrastructure, wastewater, government buildings, fit-out and retrofit projects.

A scheduling manager for your project

Bring in Taha Messaoudi for the schedule itself, or to train the team that runs it.

  1. 01

    Bid and proposal schedules

    Schedules for tenders and proposals: logic-driven, resource-loaded and ready for the owner's submission requirements.

    Book a consultation
  2. 02

    Schedule maintenance

    Regular updates of your P6 schedule: progress, logic review, health checks, a weekly report and a monthly narrative against the baseline.

    Book a consultation
  3. 03

    Recovery, delay analysis and claims

    Recovery programs, schedule compression, time impact analysis, and the preparation and review of delay claims.

    Book a consultation
  4. 04

    Team training

    Scheduling and project control training for project directors, sector leads and discipline leads, including block schedules and quantities from estimate to measure.

    Book a consultation

A dashboard built around your contract

Every contract asks for something different. We start from its schedule and reporting requirements, then set up the dashboard and the reports to match, before the first update.

Your contract's requirements

The update cycle, the baseline, the key milestones and the reports the contract asks for, set up in the platform from day one.

The measures your owner reads

Milestones, critical path, float, earned value and the manhour curve against the approved baseline, by zone, block, area or discipline.

Quality checks with your limits

The 14-point health check runs with the thresholds your specification sets, so every update is checked the same way before it goes out.

Office and field from one file

The project team gets its dashboard and each crew its three-week short interval plan, all from the same XER.

Every week
Progress against the plan, the next three weeks area by area, and the decisions that can't wait.
Every month
The schedule update and its narrative: progress, critical path and float, key milestones against the baseline, delays and their causes, recovery actions, and the cost and manhour curves.

Records that protect you from claims

Claims are won or lost on records. We keep every update and the reasons behind it documented from day one, and prepare and review delay claims when they come.

A record kept as you go

Every update is saved with its data date, what moved and why, so the history of the schedule can be shown, not rebuilt from memory.

Delays logged when they happen

Each delay, its cause and its effect on the critical path go into that month's narrative while the facts are fresh.

Delay claims

Preparation of delay and extension of time claims, with time impact analysis on the schedule of record.

Claims made against you

Review of the schedule analysis behind a claim: the logic, the baseline it relies on, and whether the delays really drove the finish.

We are schedulers, not lawyers: our analysis supports your contract team and your legal advisers.

Talk about a claim

Ask your schedule a question

Type a question in plain English and get the answer from the file: trace the logic flow of an activity, test a slip, list the critical work or draft your update.

Try it here on our demo schedule, with no sign-up. In the platform it works on your own XER, and your schedule never leaves your account. It reports what is in the file and won't guess.

Try

Test your schedule now, for free

Fourteen checks on your XER, with no sign-up. Your file is read and never saved.

Run the free XER check

Taha Messaoudi

Scheduling and Project Controls Manager

Taha Messaoudi prepares and maintains Primavera P6 schedules for construction projects, and trains project teams in scheduling and project control.

A civil engineer and Certified Construction Contract Administrator, Taha has led scheduling on major rail, power and infrastructure work, building resource- and cost-loaded schedules, recovery programs and time impact analyses. He works in English, French and Arabic.

From XER to answers, step by step

Short recordings of the platform at work. Pick a step or let them play through.

  • Drag and drop an XER exported from P6
  • Activities, relationships, assignments and totals read from the file
  • Warnings for missing loading, costs, calendars and resource curves

Recorded in the platform with a sample schedule built for this demo. The project, its activities and its figures are invented.

Training in scheduling and project control

Hands-on training for project teams, built around how your projects really run, so the schedule becomes something your people use to make decisions.

Project director

Know where the project stands and what threatens the finish date. Ask the right questions about a schedule and trust the answers.

Sector lead

See how your areas depend on each other, plan the handovers and spot a slipping interface while there is still time to act.

Discipline lead

Own your durations and quantities, see what is coming in the next three weeks and show the real effect of a change.

What people ask first

What is an XER file?

XER is the export format of Oracle Primavera P6. It holds a project's activities, logic, calendars, resources and codes. In P6, use File, Export and choose Primavera PM (XER).

Do I need P6 to use the platform?

You need an XER exported from P6, but nothing is installed: everything runs in your browser.

Does the platform change my schedule?

No. It reads the XER and never writes to P6. What-if durations are saved as separate scenarios, and your original file stays as it was.

Who can see my schedules?

Only you. Each account sees its own uploads, and field users see only the activities you assign to them. The free health check does not save your file at all.

What is the DCMA 14-point assessment?

A set of 14 checks that tests how well a schedule is built: logic, leads, lags, constraints, float, durations, the critical path and execution against plan.

Can you build or maintain the schedule for us?

Yes. Bid and proposal schedules, regular schedule maintenance and team training are all offered as services alongside the platform.

Talk about your schedule

Book a consultation with Taha Messaoudi, or see what the free check finds in your XER first.

Primavera P6 Scheduling, XER Health Check and Training | TM Scheduling